Home»Our Manufacturing Facility

Our Manufacturing Facility


Workshop 1 (Machine Unit)1

  1. Total Area- 12,500 Sq./ft
  2. Total Production Capacity- 15 Machines/Month

Workshop 2 (Machine Unit):

  1. Total Area- 15,500 Sq./ft.
  2. Total Production Capacity- 20 Machines/Month

Workshop 3 (In-house Tool Room):

  1. Total Area- 1,500 Sq./ft.
  2. Total Production Capacity- 10-15 Molds/Month

How We Stand Different From Others In Quality?


Simulation (FEA):

As part of our standard procedure, we ensure that every component we produce can function under real-world conditions by performing Finite Element Analysis on every machine component while taking the client's location's operating temperature and weather conditions into account

Simulation (FEA):

A well defined tolerances are applied to the drawing with the use of MBD tools which are driven by AI algorithms.

We are making sure that no unnecessary parts are collided with each other except Threading zones.

While analyzing the geometry we are taking care of the points like Mass, Volume, C.G. and Moment of Inertia.

Quality Check

  1. After machining, each machined parts undergoes a meticulous quality check on its individual parts to ensure a high-quality finish.
  2. Our inspection process includes detailed examinations of components for precision, durability, and adherence to specifications.
  3. We assess the integrity of materials, confirm proper assembly, and verify that all parts function seamlessly together. This rigorous scrutiny helps identify any defects or inconsistencies, allowing us to make necessary adjustments before final assembly.
  4. By ensuring each part meets stringent quality standards, we guarantee that the completed machine performs optimally and maintains its high-quality finish, enhancing reliability and longevity.

Our Near Future Expansion:

We are moving to the better workplace in vision to enhance our production capacity. The new manufacturing plant is under Phase 3 of the construction at our new plant located in Bakrol (Ahmedabad), with about 60% of the work completed. The plant spans a total area of 150,000 square feet and has a production capacity of approximately 150 machines per month. We plan to transition to the new facility by January 2025.